Phase 6: Fueling System, Instrumentation & Misc  
Continuing with the work - We're going to need the space for a few things, so the tank had to be cut-up and shortened by about 40%.

Continuing with the work - We're going to need the space for a few things, so the tank had to be cut-up and shortened by about 40%.


Powered by Gallery v1