...it was time to finish welding the downpipe itself.
Viewed: 2530 times.
|
Downpipe completed - you can see the lambda (O2) sensor in there as well.
Viewed: 2642 times.
|
Tightest and smootest bend achievable under these circumstances.
Viewed: 2540 times.
|
It has been anti-rust treated and painted later on ofcourse.
Viewed: 2894 times.
|
Backbox of the rear engine now in place too.
Viewed: 2653 times.
|
Exhaust system completed, at least for the time being.
Viewed: 3369 times.
|
Two pugs, three engines and also... PHASE 4 COMPLETE!!! :-)
Viewed: 3924 times.
|
After completing front engine's cooling and exhaust systems, we hard-wired an external
405 fuel pump to start the front engine after several months of being out of use...
video available here:
http://www.youtube.com/watch?v=nCOxRkber7E
Viewed: 3626 times.
|