...so it will have to go over the engine, just as the "hot" coolant hose.
Viewed: 2646 times.
|
The work on rear coolant hoses will continue in next phase of work though.
Viewed: 2523 times.
|
After we completed the front engine coolant system, it was time to sort out the exhast systems as well.
Viewed: 2427 times.
|
205 Mi32 at the exhaust specialist's.
Viewed: 2907 times.
|
Renault 25 V6 middle boxes were chosen as best fit for our application...
Viewed: 2612 times.
|
...as there is less space than I initially expected there'd be.
Viewed: 2563 times.
|
Front engine exhast system completed.
Viewed: 2723 times.
|
Construction of the rear downpipe - started with the divider extension...
Viewed: 2995 times.
|
...which was then welded in and a piece of Xsara VTS downpipe spot-welded over it.
Viewed: 2714 times.
|
It was then require to make a bend which will join a straight piece of pipe under the car...
Viewed: 2755 times.
|
...and the downpipe.
Viewed: 2537 times.
|
A lot of adjusting had been required....
Viewed: 2477 times.
|
...before all the little pieces could be welded together.
Viewed: 2483 times.
|
Another action pic.
Viewed: 2417 times.
|
And another :-).
Viewed: 2479 times.
|
With the bend completed and connected to the downpipe...
Viewed: 2587 times.
|