Bodywork In Progress 
doors stripped ready for perspex windows . and possibly either alluminium or fibreglass panels with a pull cord lock system
doors stripped ready for perspex windows . and possibly either alluminium or fibreglass panels with a pull cord lock system
Viewed: 1948 times.

one cleaned and repainted subframe, with poly arb and wishbone bushes.
need new track rod ends but that will come later.
one cleaned and repainted subframe, with poly arb and wishbone bushes.
need new track rod ends but that will come later.
Viewed: 1873 times.

donor car. was a xsara vts! pretty banged up though
donor car. was a xsara vts! pretty banged up though
Viewed: 1948 times.

look what i found .went down there a week later though and it was stripped.
look what i found .went down there a week later though and it was stripped.
Viewed: 2483 times.

bay cleaned and painted with bridge paint. it is supposed to have a 30 yr guarentee.
bay cleaned and painted with bridge paint. it is supposed to have a 30 yr guarentee.
Viewed: 1882 times.

bay repainted.JPG
bay repainted.JPG
Viewed: 1888 times.

before 1.JPG
before 1.JPG
Viewed: 1831 times.

before 2.JPG
before 2.JPG
Viewed: 1736 times.

stripped interior. all thats left is the dash. also made an excecutive decision to keep the heater given what british weather is like
stripped interior. all thats left is the dash. also made an excecutive decision to keep the heater given what british weather is like
Viewed: 1786 times.

slimy greay leaky engine removed with no hoist i might add!
slimy greay leaky engine removed with no hoist i might add!
Viewed: 1858 times.

old engine2.JPG
old engine2.JPG
Viewed: 1745 times.

only rusty part i found in the bay. all fixed now though
only rusty part i found in the bay. all fixed now though
Viewed: 2015 times.

Powered by Gallery v1