Structure 
structural welding and rust fight started from front
structural welding and rust fight started from front
Viewed: 783 times.

new, improved ride height added to easy access
new, improved ride height added to easy access
Viewed: 692 times.

bulkhead hole was nasty, metal has ben cut out and new plate welded in
bulkhead hole was nasty, metal has ben cut out and new plate welded in
Viewed: 815 times.

i guess water draining down the left frame support is responsible for that hole
i guess water draining down the left frame support is responsible for that hole
Viewed: 809 times.

seam weld added to front frame support
seam weld added to front frame support
Viewed: 818 times.

engine bay welding done
engine bay welding done
Viewed: 794 times.

bulkhead to floor joint sorted
bulkhead to floor joint sorted
Viewed: 817 times.

here i had a hole from nowhere
here i had a hole from nowhere
Viewed: 751 times.

Viewed: 794 times.

bulkhead plate work in progress
bulkhead plate work in progress
Viewed: 769 times.

fixed!
fixed!
Viewed: 769 times.

let's do split seam on B-post
let's do split seam on B-post
Viewed: 781 times.

paint and sealer down...
paint and sealer down...
Viewed: 774 times.

welding and grinding...
welding and grinding...
Viewed: 747 times.

welding was done on whole length of panel joint, plus another 10cm seam weld on rear panel sill joint. this should prevent body flex stress concentrating on B post joint
welding was done on whole length of panel joint, plus another 10cm seam weld on rear panel sill joint. this should prevent body flex stress concentrating on B post joint
Viewed: 809 times.

inside was tackled too, i hope this won't let go soon!
inside was tackled too, i hope this won't let go soon!
Viewed: 783 times.

Powered by Gallery v1