Structure 
structural welding and rust fight started from front
structural welding and rust fight started from front
Viewed: 758 times.

new, improved ride height added to easy access
new, improved ride height added to easy access
Viewed: 664 times.

bulkhead hole was nasty, metal has ben cut out and new plate welded in
bulkhead hole was nasty, metal has ben cut out and new plate welded in
Viewed: 790 times.

i guess water draining down the left frame support is responsible for that hole
i guess water draining down the left frame support is responsible for that hole
Viewed: 784 times.

seam weld added to front frame support
seam weld added to front frame support
Viewed: 794 times.

engine bay welding done
engine bay welding done
Viewed: 765 times.

bulkhead to floor joint sorted
bulkhead to floor joint sorted
Viewed: 792 times.

here i had a hole from nowhere
here i had a hole from nowhere
Viewed: 726 times.

Viewed: 770 times.

bulkhead plate work in progress
bulkhead plate work in progress
Viewed: 746 times.

fixed!
fixed!
Viewed: 741 times.

let's do split seam on B-post
let's do split seam on B-post
Viewed: 756 times.

paint and sealer down...
paint and sealer down...
Viewed: 750 times.

welding and grinding...
welding and grinding...
Viewed: 723 times.

welding was done on whole length of panel joint, plus another 10cm seam weld on rear panel sill joint. this should prevent body flex stress concentrating on B post joint
welding was done on whole length of panel joint, plus another 10cm seam weld on rear panel sill joint. this should prevent body flex stress concentrating on B post joint
Viewed: 783 times.

inside was tackled too, i hope this won't let go soon!
inside was tackled too, i hope this won't let go soon!
Viewed: 755 times.

Powered by Gallery v1