Structure 
structural welding and rust fight started from front
structural welding and rust fight started from front
Viewed: 611 times.

new, improved ride height added to easy access
new, improved ride height added to easy access
Viewed: 529 times.

bulkhead hole was nasty, metal has ben cut out and new plate welded in
bulkhead hole was nasty, metal has ben cut out and new plate welded in
Viewed: 623 times.

i guess water draining down the left frame support is responsible for that hole
i guess water draining down the left frame support is responsible for that hole
Viewed: 634 times.

seam weld added to front frame support
seam weld added to front frame support
Viewed: 646 times.

engine bay welding done
engine bay welding done
Viewed: 620 times.

bulkhead to floor joint sorted
bulkhead to floor joint sorted
Viewed: 603 times.

here i had a hole from nowhere
here i had a hole from nowhere
Viewed: 583 times.

Viewed: 627 times.

bulkhead plate work in progress
bulkhead plate work in progress
Viewed: 591 times.

fixed!
fixed!
Viewed: 596 times.

let's do split seam on B-post
let's do split seam on B-post
Viewed: 602 times.

paint and sealer down...
paint and sealer down...
Viewed: 601 times.

welding and grinding...
welding and grinding...
Viewed: 571 times.

welding was done on whole length of panel joint, plus another 10cm seam weld on rear panel sill joint. this should prevent body flex stress concentrating on B post joint
welding was done on whole length of panel joint, plus another 10cm seam weld on rear panel sill joint. this should prevent body flex stress concentrating on B post joint
Viewed: 641 times.

inside was tackled too, i hope this won't let go soon!
inside was tackled too, i hope this won't let go soon!
Viewed: 614 times.

Powered by Gallery v1