General 
ready for the floor
ready for the floor
Viewed: 1238 times.

insulation mats
insulation mats
Viewed: 1248 times.

carpet, rear cabin mouldings, safety belts and door seals fitted
carpet, rear cabin mouldings, safety belts and door seals fitted
Viewed: 1220 times.

cabin rear end finished
cabin rear end finished
Viewed: 1177 times.

rear seats cleaned and fitted
rear seats cleaned and fitted
Viewed: 1140 times.

Viewed: 1205 times.

'signal' loom cleaned, repaired where needed, ready for go
'signal' loom cleaned, repaired where needed, ready for go
Viewed: 1288 times.

looming 1st step..
looming 1st step..
Viewed: 1223 times.

2nd...
2nd...
Viewed: 1271 times.

airbox fitted
airbox fitted
Viewed: 1195 times.

facia panel fitted, i put some rubber cushions at fixing points, curious about rattles and creaks
facia panel fitted, i put some rubber cushions at fixing points, curious about rattles and creaks
Viewed: 1229 times.

project stand as you read...
project stand as you read...
Viewed: 1146 times.

fuseboard 'kabelsalat', wires coming from everywhere. 
this is going to be tough to crack
fuseboard 'kabelsalat', wires coming from everywhere.
this is going to be tough to crack
Viewed: 1150 times.

lot of working hours later, wiring finally tided up.
lot of working hours later, wiring finally tided up.
Viewed: 1071 times.

dash almost completed
dash almost completed
Viewed: 1162 times.

drivers vs passenger seat
drivers vs passenger seat
Viewed: 1189 times.

Powered by Gallery v1