General 
ready for the floor
ready for the floor
Viewed: 1225 times.

insulation mats
insulation mats
Viewed: 1237 times.

carpet, rear cabin mouldings, safety belts and door seals fitted
carpet, rear cabin mouldings, safety belts and door seals fitted
Viewed: 1207 times.

cabin rear end finished
cabin rear end finished
Viewed: 1162 times.

rear seats cleaned and fitted
rear seats cleaned and fitted
Viewed: 1124 times.

Viewed: 1191 times.

'signal' loom cleaned, repaired where needed, ready for go
'signal' loom cleaned, repaired where needed, ready for go
Viewed: 1272 times.

looming 1st step..
looming 1st step..
Viewed: 1209 times.

2nd...
2nd...
Viewed: 1262 times.

airbox fitted
airbox fitted
Viewed: 1185 times.

facia panel fitted, i put some rubber cushions at fixing points, curious about rattles and creaks
facia panel fitted, i put some rubber cushions at fixing points, curious about rattles and creaks
Viewed: 1215 times.

project stand as you read...
project stand as you read...
Viewed: 1134 times.

fuseboard 'kabelsalat', wires coming from everywhere. 
this is going to be tough to crack
fuseboard 'kabelsalat', wires coming from everywhere.
this is going to be tough to crack
Viewed: 1139 times.

lot of working hours later, wiring finally tided up.
lot of working hours later, wiring finally tided up.
Viewed: 1062 times.

dash almost completed
dash almost completed
Viewed: 1151 times.

drivers vs passenger seat
drivers vs passenger seat
Viewed: 1176 times.

Powered by Gallery v1